Our projects
- Dismantling of all the equipments and disinfection of all the wastes and material coming from the site before elimination and recovery in appropriate path. (5.000 m3 of liquid effluents and sludge polluted by heavy metals and 500 tons of other wastes including special industrial wastes
- Works realized with self-contained breathing apparatus and under OIMS Exxon Mobil procedure